The refinery in Cienfuegos based on the Soviet technology was completed in 1989. It was in operation until 1995, afterwards its operation was suspen- ded because of the cancellation of collaboration with the main supplier of raw materials. A study of refinery reactivation and recovery of its operation was proposed in 2005.

The reactivation consisted of:

  • repairs of existing technology devices
  • repairs of actuators – pumps and valves
  • modernisation of field instrumentation
  • complete replacement of the original remote control of pneumatic regulation by modern computer control system

2006, the Cuban CUPET company made a selection of contractors for refine- ry reactivation in collaboration with the Venezuelan PDSVA company.

The ENERGO CONTROL Ltd. company presented their offer, which was ac- cepted by customer and integrated into the implementation of the project of refinery modernization in the following range:

  • complete replacement of field instrumentation – pressure, temperature, flow and level sensors and process analyses
  • complete replacement of cabling
  • deployment of computer control systems for the automatic control and protection of technology process in the following range:
    • DCS – decentralized control system
    • SPE – Fail safe system
    • CMS – safety compressor management system
    • BMS – safety burner management system

1. Simulator for Process Control *2007

Scope of project:

  • elaboration of project documentation
  • supply of system Centum CS 3000 (Yokogawa) control system, and of operator and engineering work stations
  • putting into operation
  • training of the client

2. Reactivation of Refinery *2007

Scope of project:

  • Elaboration of project documentation – basic design and detailed engineering
  • Delivery instrumentation – pressure, temperature, flow and level sensors and analytic measurements installation, material – cable conduits, routes, cables, impulse piping, supporting structures, fire walls, electric and pneumatic positioners for control valves (250 pieces), burners (52 pieces)
  •  

Scope of project

  • Elaboration of design documentation
  • Delivery
    • Instruments – sensors of pressure, temperature, flow, levels and analytic measurements
    • Heavy current distribution
    • Installation material – cable troughs, routes, cables, impulse pipes, supporting structures, fire walls
    • Burners (5 pcs)
    • Control system DCS, SPE, CMS, BMS
    • of operator and engineering workplaces
  • Development of user software
  • Installation of equipment
  • Putting into operation
  • Training of the client
 

3. S–300 Hydrogenation of diesel *2009

4. Truck Loading Stations *2013

Scope of project:

 
  • Elaboration of design documentation
  • Delivery
    • Filling isles with equipment
    • Instruments – sensors of pressure, temperature, flow, levels and analytic measurements
    • Heavy current distribution
    • Pneumatic control valves
    • Product pumps with filters
    • Installation material – cable troughs, routes, cables, impulse pipes, supporting structures, fire walls
    • riadiaci systém DCS, SPE, CMS, BMS
    • operátorských a inžinierskych pracovísk
  • Development of user software
  • Installation of equipment
  • Putting into operation
  • Training of the client
  •  

5. Delivery of burners and its accessories *2016

Scope of project

  • Elaboration of design documentation
  •  Delivery
    • Quemadores completos 2,1 – 4,9 MW (20 unds.)
    • Quemadores completos 2,1 – 4,9 MW (20 unds.)
    • Detectores de llama (75 unds.)
  • Asistencia técnica durante la instalación y puesta en marcha

6. Distribution of compressed air in the operation area *2009

7. Delivery of GLP – Chromatograph *2009

8. Delivery of Control Valves *2009