During the period of 2012-2013, the Energo Control Ltd. company has participated in the construction of a new modern biomass power plant in the VSS Košice premises.
The Marcus Industry a.s. Košice company was the main contractor of this project, the wood chip boiler was constructed by the Slovenské energetické závody Tlmače a.s. company and the turbo generator was provided by the Siemens s.r.o. company.
The Energo Control Ltd. company has provided for the supply of the Control and Regulation System and Heavy Current Operating Distribution in the following extent: