4 MW Power Plant for the Combustion of Biomass

During the period of 2012-2013, the Energo Control Ltd. company has participated in the construction of a new modern biomass power plant in the VSS Košice premises.

The Marcus Industry a.s. Košice company was the main contractor of this project, the wood chip boiler was constructed by the Slovenské energetické závody Tlmače a.s. company and the turbo generator was provided by the Siemens s.r.o. company.

The Energo Control Ltd. company has provided for the supply of the Control and Regulation System and Heavy Current Operating Distribution in the following extent:

  • elaboration of design documentation – basic design
  • elaboration of detailed design documentation – detailed engineering
  • delivery of field instruments
  • production and delivery of distribution technology
  • delivery of frequency switches for the control of regulation bodies
  • delivery of Simatic S7 control system
  • elaboration of user software
  • installation of suppliant equipment and devices and elaboration of revision reports
  • putting into operation and individual testing of circuits
  • participation during functional and complex testing
  • elaboration of as-built documentation of installation