Bearing in mind all the conditions according to the signed contract, currently, the construction of the control system (DCS) and field equipment system is in progress for the collection of the information from the field in order to renew unit #5 in the Planta Centro power plant, Venezuela.
Basic parameters of the unit:
Basic parameters of the unit: 400 MW
Type of combustion process podtlak
Fuel oil / gas
The basic division of the system from the technology point of view is:
Production unit consisting of boiler room, machine room and turbine
Control of boiler room (combustion, water, steam)
Burner management system (BMS) and emergency shut-down system of the boiler (ESD)
Control of machine room (AP, BP heaters, by-pass system, condensate)
Generator (outlet of generator output, phasing)
Regulations of the turbine (speed, pressure, performance ,…)